Tuesday, June 19, 2018

Brazil hydroelectric power plants




Notes :

  • Circle size is the plant's capacity.
  • Itaipu considered 7.000 MW (Brazilian share).
  • Belo Monte considered full capacity 11.232 MW (expected to reach  in 2020).